I'm not that familiar with the terrain, but much of the extension to be built is aerial. I'm assuming the northern aerial is to bridge a creek, I'm not sure why the southern section is. There's usually a valid engineering reason for going up. Maybe it's very rough terrain in the rural area, and DART decided to just smooth the ride out and avoid some grades? Does anyone familiar with the area have a better reason?



Reply With Quote





Bookmarks